{"id":24928,"date":"2017-05-30T16:34:00","date_gmt":"2017-05-30T07:34:00","guid":{"rendered":"https:\/\/www.ejec.ej-hds.co.jp\/web\/?p=24928"},"modified":"2025-09-25T09:42:08","modified_gmt":"2025-09-25T00:42:08","slug":"jsce-prize","status":"publish","type":"post","link":"https:\/\/www.ejec.ej-hds.co.jp\/en\/all\/topics\/jsce-prize\/","title":{"rendered":"EJEC won the JSCE\u2019s Outstanding Civil Engineering Achievement Award (Group II: Project for rehabilitation of drinking water supply systems in the Pyanj District, Khatlon Region, Republic of Tajikistan)"},"content":{"rendered":"<div class=\"comInfoBox\">\n<p class=\"comText left mb1\">The Project for rehabilitation of drinking water supply systems in the Pyanj District, Khatlon Region, Republic of Tajikistan, for which EJEC was responsible for design and construction supervision won the JSCE\u2019s Outstanding Civil Engineering Achievement Award (Group II). This award is given to selected \u201cepoch-making projects which have made an outstanding contribution to the development of civil engineering technology as well as society\u201d.<\/p>\n<p class=\"comText left mt1 mb1\">(Winners)  Tajikistan Khojagii Manziliyu-Kommunali, Embassy of Japan in Tajikistan, JICA, Dai Nippon Construction, EJEC<\/p>\n<p class=\"comText left mt1\">JSCE: <a href=\"http:\/\/www.jsce.or.jp\/prize\/prize_list\/p2016.shtml#s02\" target=\"_blank\" rel=\"noopener  referrer\" style=\"color: #0063C6;\">http:\/\/www.jsce.or.jp\/prize\/prize_list\/p2016.shtml#s02 &nbsp;<\/a>(web site in Japanese)\r\n<\/p>\n<\/div>\n\n\n\n\n<table width=\"90%\" style=\"margin-left: auto; margin-right: auto; font-weight: 500;\">\n<tbody>\n<\/tbody><caption style=\"text-align:left\">Summary of the project<\/caption>\n<tbody><tr><td style=\"padding:0.4em;\"><\/td>\n<\/tr>\n<tr>\n<td width=\"22%\" style=\"padding:0.4em; vertical-align: top;\">[Project title]<\/td>\n<td style=\"padding:0.4em;\">Project for Rehabilitation of Water Supply Systems in Pyanj District, Khatlon Region, Republic of Tajikistan<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">[Client]<\/td>\n<td style=\"padding:0.4em;\">Basic design: JICA<br>\nDetailed design, construction and construction supervision: Tajikistan Khojagii Manziliyu-Kommunali<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">[Construction\/design and construction supervision]<\/td>\n<td style=\"padding:0.4em; vertical-align: top;\">Dai Nippon Construction and EJEC<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">[Project cost]<\/td>\n<td style=\"padding:0.4em;\">Total project cost: \u00a51,816,182,200<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">[Project period]<\/td>\n<td style=\"padding:0.4em;\">March, 2013 to December, 2016 (3 years and 10 months from the basic design to project completion)<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">[Construction results]<\/td>\n<td style=\"padding:0.4em;\">Boreholes (with submerged pump: 56m&sup3;\/hr x 4; 30 m&sup3;\/hr x 2)\nElevated water tanks (1,800 m&sup3; x 1 and 250 m&sup3; x 1)<br>\nWater distribution pipelines (PVC f75 ~ 250 mm x 95 km)<br>\nHouse water taps (4,767 sites)<br>\nAdministration management building (1)<br>\nBorehole management building, including a disinfection room (2)<br>\nProcurement of equipment (maintenance vehicles; construction machinery and tools; piping materials)<\/td>\n<\/tr>\n<\/tbody><\/table>\n\n\n<div class=\"comInfoBox mt4\">\n<p class=\"comText left\">In one town and six villages targeted by the project, 73% of the local population of some 25,000 (as of 2012) did not have access to the water supply service and local residents used unhygienic water from irrigation channels or shallow wells for domestic water.<br \/>\r\nThe project envisaged the supply of clean water for 24 hours a day to some 29,000 people, taking the population growth rate up to 2020 into consideration.<br \/>\r\nThe construction work encountered a geopolitical problem during the construction period and at one time faced a risk of cancellation. However, EJEC managed to obtain a permission for continued construction through close information sharing with the Embassy of Japan in Tajikistan, JICA and Dai Nippon Construction. Despite the difficult natural conditions and living environment, the work was completed within the planned period without any accidents.<br \/>\r\nThe implementation of the project achieved a steady supply of safe water and greatly improved the situation of sanitation and daily life in the target area. Moreover, the construction of the first large RC elevated water tanks (1,800 m&sup3; and 250 m&sup3;) in Tajikistan resulted in the successful transfer of the relevant construction technology, including quality control, to the Tajikistan side.<\/p>\n<\/div>\n\n\n\n\n<img decoding=\"async\" src=\"https:\/\/www.ejec.ej-hds.co.jp\/web\/wp-content\/uploads\/17052201.jpg\" alt=\"1,800 m3 elevated water tank\" class=\"aligncenter\"><p style=\"text-align: center;\"><span>1,800 m\u00b3 elevated water tank<\/span><\/p>\n<img decoding=\"async\" src=\"https:\/\/www.ejec.ej-hds.co.jp\/web\/wp-content\/uploads\/17052202.jpg\" alt=\"250m3 elevated water tank\" class=\"aligncenter\"><p style=\"text-align: center;\"><span>250 m\u00b3 elevated water tank<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Summary of the project [Project title] Project for Rehabilitation of Water Supply Systems in Pyanj District, Khatlon Region, Republic of Tajikistan [Client] Basic design: JICA Detailed design, construction and construction supervision: Tajikistan Khojagii Manziliyu-Kommunali [Construction\/design and construction supervision] Dai Nippon Construction and EJEC [Project cost] Total project cost: \u00a51,816,182,200 [Project period] March, 2013 to December, [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":1786,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_locale":"en_US","_original_post":"https:\/\/www.ejec.ej-hds.co.jp\/web\/?p=413","footnotes":""},"categories":[38,36,25],"tags":[],"class_list":["post-24928","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-river-harbor","category-international-consulting","category-topics","en-US"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts\/24928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/comments?post=24928"}],"version-history":[{"count":12,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts\/24928\/revisions"}],"predecessor-version":[{"id":30464,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts\/24928\/revisions\/30464"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/media\/1786"}],"wp:attachment":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/media?parent=24928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/categories?post=24928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/tags?post=24928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}