{"id":24850,"date":"2016-11-30T15:44:00","date_gmt":"2016-11-30T06:44:00","guid":{"rendered":"https:\/\/www.ejec.ej-hds.co.jp\/web\/?p=24850"},"modified":"2025-09-25T09:43:37","modified_gmt":"2025-09-25T00:43:37","slug":"tajikistan_water_suplly","status":"publish","type":"post","link":"https:\/\/www.ejec.ej-hds.co.jp\/en\/all\/topics\/tajikistan_water_suplly\/","title":{"rendered":"Tajikistan: construction of water supplying wells, elevated water tanks and water supply systems"},"content":{"rendered":"\n<img decoding=\"async\" src=\"https:\/\/www.ejec.ej-hds.co.jp\/web\/wp-content\/uploads\/international_cnst00701.jpg\" alt=\"\u4f5c\u54c1\u96c6\uff1a\u30bf\u30b8\u30ad\u30b9\u30bf\u30f3\u56fd\uff1a\u6c34\u6e90\u4e95\u6238\u30fb\u9ad8\u67b6\u6c34\u69fd\u30fb\u6c34\u9053\u5efa\u8a2d\" width=\"708\" height=\"604\" class=\"aligncenter\">\n\n\n<div class=\"comInfoBox mt4\">\n<p class=\"comText left mb1\">Under this project, two water supply systems were constructed in the Pyanj District, Khatlon Region where access rate to clean water was 47% which was below the national average. The development of water supply facilities was one of the highest priorities identified by the National Development Plan (2007 \u2013 2015) and National Water Supply Plan (2006).<\/p>\n<p class=\"comText left mt1 mb1\">1) Pyanji and three neighbouring villages<br \/>\r\n\u3000Planned population for water supply : Approx. 24,000<br \/>\r\n\u3000Water supply volume : 5,315 m&sup3;\/day<br \/>\r\n\u3000Water source : Boreholes (L = 96.0 m x 4)<br \/>\r\n\u3000Facilities:<br \/>\r\n\u3000\u2013 One elevated water tank : RC; V = 1,800 m&sup3;; H =20m<br \/>\r\n\u3000\u2013 One administrative office building<br \/>\r\n\u3000\u2013 One borehole management building, including a disinfection room<br \/>\r\n\u3000Water distribution pipeline : PVC, f75 \u2013 250 mm; L = approx.70 km; water supply pipe : 3,933 sites<\/p>\n<p class=\"comText left mt1\">2) Three northern villages<br \/>\r\n\u3000Planned population for water supply : approx. 5,300<br \/>\r\n\u3000Water supply volume : 735 m&sup3;\/day<br \/>\r\n\u3000Water source : Boreholes (L = 90.5 m x 2)<br \/>\r\n\u3000 Facilities :<br \/>\r\n\u3000\u2013 One elevated water tank : RC; V = 250 m&sup3;; H = 20m<br \/>\r\n\u3000\u2013 One borehole management building, including a disinfection room<br \/>\r\n\u3000Water distribution pipeline : PVC, f75 \u2013 150 mm; L = approx.25 km; <br \/>\r\n\u3000water supply pipe : 834 sites<\/p>\n<\/div>\n\n\n\n\n<table width=\"90%\" style=\"margin-left: auto; margin-right: auto; font-weight: 500;\">\n<tbody><tr>\n<td width=\"20%\" style=\"padding:0.4em; vertical-align: top;\">Work title<\/td>\n<td style=\"padding:0.4em;\">The Project for Rehabilitation of Drinking Water Supply Systems in Pyanj District, Khatlon Region, Republic of Tajikistan<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">Location<\/td>\n<td style=\"padding:0.4em;\">Pyanj District, Khatlon Region, Republic of Tajikistan<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">Duration<\/td>\n<td style=\"padding:0.4em;\">Preliminary study: March, 2013 to December, 2013<br>Detailed design: February, 2014 to July, 2014<br>Tender\/construction work supervision: July, 2104 to November, 2016<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">Implementing body<\/td>\n<td style=\"padding:0.4em; vertical-align: top;\">Khojagii Manziliyu Kommunali (KMK: Housing Service Corporation) of Tajikistan<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:0.4em; vertical-align: top;\">Funding<\/td>\n<td style=\"padding:0.4em;\">Grant Aid by the Government of Japan<\/td>\n<\/tr>\n<\/tbody><\/table>\n","protected":false},"excerpt":{"rendered":"<p>Work title The Project for Rehabilitation of Drinking Water Supply Systems in Pyanj District, Khatlon Region, Republic of Tajikistan Location Pyanj District, Khatlon Region, Republic of Tajikistan Duration Preliminary study: March, 2013 to December, 2013Detailed design: February, 2014 to July, 2014Tender\/construction work supervision: July, 2104 to November, 2016 Implementing body Khojagii Manziliyu Kommunali (KMK: Housing [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":16520,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_locale":"en_US","_original_post":"https:\/\/www.ejec.ej-hds.co.jp\/web\/?p=141","footnotes":""},"categories":[38,36,25],"tags":[],"class_list":["post-24850","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-river-harbor","category-international-consulting","category-topics","en-US"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts\/24850","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/comments?post=24850"}],"version-history":[{"count":19,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts\/24850\/revisions"}],"predecessor-version":[{"id":30467,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/posts\/24850\/revisions\/30467"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/media\/16520"}],"wp:attachment":[{"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/media?parent=24850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/categories?post=24850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ejec.ej-hds.co.jp\/wp-json\/wp\/v2\/tags?post=24850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}